frequently asked questions
How do we secure a place in the waiting list?
By paying a deposit.
Is the deposit part of the contract sum or is it on top?
The deposit is included in the contract sum and will be deducted from the practical completion claim.
Are Council fees, engineering, soil tests, building surveyors and design fees included?
Yes
Do you only build Maveric standard plans?
No, you can provide your own plans which we can price, however they must be produced by an accredited architect or draftsman to a standard which will allow council submission.
Can Maveric plans be modified?
Yes, in fact our standard plans often simply act as a starting point which can be developed into a plan which will suit yourpersonal needs and requirements perfectly
Does Maveric build extensions?
Yes, large and small.
Do I have access to the house during construction?
YES, Predominantly due to liability and insurance issues access is limited to arranged visits. We will always be happy to attend a site meeting to discuss any concerns.
How long does the process of building take?
The process of design, engineering, and Council approvals will commonly take 3 to 4 months. Once a building permit has been received from the local authority, construction time is 100 - 120 days (depending on size) from the day the footings are excavated.
Will the contract sum vary once we have signed?
NO - Unless you make changes to structure, fixtures or fittings, the price won't change. However there are circumstances such as when rock is found either in service trenches or footings or Council conditions where extra costs will be incurred.